The solar photovoltaic plant installed on the Zadejë Dam at the Vau i Dejës Hydropower Plant is another strategic and innovative investment by the Albanian Power Corporation (KESH sh.a.). Building on the success of the pioneering project at the Qyrsaq Dam, the plant expands KESH’s solar generation capacity using existing hydropower infrastructure and brings together two renewable energy sources in a single location.
Scheduled to begin generating electricity in December 2026, the plant is designed to operate efficiently and help diversify KESH’s generation portfolio. The project complies with current technical and dam safety standards and preserves the structural integrity of the existing hydropower infrastructure.
The investment marks a step forward in the transition of Albania’s power sector to cleaner energy and reflects KESH’s commitment to developing renewable energy sources in a sustainable and integrated way.
Key project objectivesThe Zadejë Solar Photovoltaic Plant is part of KESH’s efforts to modernise its generation assets and support a cleaner, more sustainable energy future for Albania.
| Parameter | Value | Unit |
|---|---|---|
| Installed capacity | 8.25 | MWp |
| Expected annual generation | 11,900 | MWh |
| Plant service life | 25 | years |
| Expected start of generation | December 2026 | — |