Ulitizing Resources

Keeping levels in HPP basins above average perennial levels during the year (Fierza + 7.7m, Komani + 1.5m, Vau i Dejës + 0.35m) resulted in higher utilization of hydraulic resources and was one of the factors affecting in maximizing annual output.

Average utilization level and flows at HPP Fierza during 2018

Exploitation and management of natural flows in the Drin River Cascade

Gjashtëmujori i pare i vitit 2018 rezultoi te jete me prurje 621 m3/s, shume me te larta se mesatarja shumevjecare (407 m3/s) dhe njekohesisht i krahasueshem me gjashtemujorin e pare te viteve 2010 (691 m3/s) dhe 2013 (629 m3/s).

Prodhimi i kaskades ne 6-mujorin e pare te ketij viti eshte 9.914 GWh ose rreth 53% me shume se mesatarja e 15 viteve te fundit (2557 GWH) si dhe rreth 200 GWh me shume se ne vitin 2013, per te njejten sasi prurjesh. Gjate kesaj periudhe u rregjstruan vlerat me te larta historike te prodhimit ditor (29,121 MWh), te prodhimit mujor (848.5 GWh), dhe te rezerves energjitike ne fillim te muajit Korrik (1,399 GWh). Per shkak te rehabilitimit ne HEC Koman dhe kufizimeve ne transmetim, kapacitetet gjeneruese te siponueshme per shfrytezim gjate periudhes ishin reth 161 MW me te vogla se ne vitet 2010 e 2013.

Nderkiohe qe per nivele pothuajse te njejta prodhimi, shkarkimet pa prodhim te energjise elektrike, ne vitin 2018 ishin rreth 40% me te ulta se ato 2010-ës. Per te njejten periudhe, rezerva energjitike e kaskades ne vitin 2018 u rrit me rreth 288 GWh , nderkohe qe ne 2010-n (megjithese me prurje me te larta) ajo u rrit me vetem 21 GWh.
Ndryshe nga vitet 2010 e 2013, prej 1 Janarit 2018 KESH eshte subjekt i disbalancave si dhe pale pergjegjese per ofrimin e sherbimeve ndihmese. Megjithese i ndodhur ne kushtet e trysnise se jashtezakonshme te permbushjes se detrimeve te shumefishta per sherbim publik, KESH arriti te planifikoje dhe prodhoje ne nivele maksimale pa shkaktuar disbalanca thelbesore.