The current situation in the Drin river cascade is presented:

Natural arrivals in cascade are 340 m3 / s.

The levels in the lakes of the Drini Cascade are:

* Fierzë HPP – 292.25 masl, (quota max. 296 masl)

* Koman HPP – 172.08  masl, (quota max. 175.5 masl)

* Vau i Dejës HPP –73.90  masl (max. Quota 76 masl)

Production in all three HPPs is:

* Fierzë HPP, 8,800 MWh (daily)

* Koman HPP, 8,300 MWh (daily)

* Vau Dejës HPP, 4,100 MWh (daily)

In any change of data, the Electroenergy Corporation will keep public opinion transparent informed and responsible authorities