The current situation in the Drin river cascade is presented:
Natural arrivals in cascade are 420 m3 / s.
The levels in the lakes of the Drini Cascade are:
* Fierzë HPP – 293.46 masl, (quota max. 296 masl)
* Koman HPP –172.37 masl, (quota max. 175.5 masl)
* Vau i Dejës HPP – 74.12 masl (max. Quota 76 masl).
Production in all three HPPs is:
* Fierzë HPP, 6,800 MWh (daily)
* Koman HPP, 7,284 MWh (daily)
* Vau Dejës HPP, 2,400 MWh (daily).
In any change of data, the Electroenergy Corporation will keep public opinion transparent informed and responsible authorities.