The current situation in the Drin river cascade is presented:
Natural arrivals in cascade are 460 m3 / s.
The levels in the lakes of the Drini Cascade are:
* Fierzë HPP – 292.89 masl, (quota max. 296 masl)
* Koman HPP – 172.58 masl, (quota max. 175.5 masl)
* Vau i Dejës HPP –74.13 masl (max. Quota 76 masl)
Production in all three HPPs is:
* Fierzë HPP, 5,700 MWh (daily)
* Koman HPP, 8,600 MWh (daily)
* Vau Dejës HPP, 4,120 MWh (daily)
Total production meets all demand for electricity consumption for the country.