The current situation in the Drin river cascade is presented:
Natural arrivals in cascade are 350 m3 / s. The levels in the lakes of the Drini Cascade are:
* Fierzë HPP –293.82 masl, (quota max. 296 masl)
* Koman HPP –173.48 masl, (quota max. 175.5 masl)
* Vau i Dejës HPP –74.15 masl (max. Quota 76 masl)
Production in all three HPPs is:
* Fierzë HPP, 5,711 MWh (daily)
* Koman HPP, 7,732 MWh (daily)
* Vau Dejës HPP, 4,261 MWh (daily).
In any change of data, the Electroenergy Corporation will keep public opinion transparent informed and responsible authorities.