The current situation in the Drin river cascade is presented:
Natural arrivals in cascade are 390 m3 / s. The levels in the lakes of the Drini Cascade are:
* Fierzë HPP – 293.99 masl, (quota max. 296 masl)
* Koman HPP –173.23 masl, (quota max. 175.5 masl)
* Vau i Dejës HPP –74.32 masl (max. Quota 76 masl)
Production in all three HPPs is:
* Fierzë HPP, 6,900 MWh (daily)
* Koman HPP, 8,700 MWh (daily)
* Vau Dejës HPP, 4,300 MWh (daily).
In any change of data, the Electroenergy Corporation will keep public opinion transparent informed and responsible authorities.