The current situation in the Drin river cascade is presented:
Natural arrivals in cascade are 400 m3 / s. The levels in the lakes of the Drini Cascade are:
* Fierzë HPP – 294.01 masl, (quota max. 296 masl)
* Koman HPP –173.58 masl, (quota max. 175.5 masl)
* Vau i Dejës HPP –74.39 masl (max. Quota 76 masl)
Production in all three HPPs is:
* Fierzë HPP, 6,000 MWh (daily)
* Koman HPP, 7,800 MWh (daily)
* Vau Dejës HPP, 4,200 MWh (daily).
In any change of data, the Electroenergy Corporation will keep public opinion transparent informed and responsible authorities.