The current situation in the Drin river cascade is presented:

Natural arrivals in cascade are  480  m3 / s.

The levels in the lakes of the Drini Cascade are:

* Fierzë HPP – 296.58 masl, (quota max. 296 masl)

* Koman HPP –172.17 masl, (quota max. 175.5 masl)

* Vau i Dejës HPP – 73.13  masl (max. Quota 76 masl).

Production in all three HPPs is:

* Fierzë HPP, 5,250 MWh (daily)

* Koman HPP, 7,350 MWh (daily)

* Vau Dejës HPP, 3,290 MWh (daily).

In any change of data, the Electroenergy Corporation will keep public opinion transparent informed and responsible authorities.