The current situation in the Drin River cascade is:

Natural flows in the cascade are 1170 m3 / s.

Discharges from production and discharge from gates are:

  • Fierza HPP – 490 m3 / s from production, 400 m3 / s discharges from gates.
  • Koman HPP – 678 m3 / s from production, 300 m3 / s discharges from gates.
  • Vau Dejës HPP- 420 m3 / s from production, 850 m3 / s discharges from gates
  • The levels in the lakes of the Drini Cascade are:
  • Fierza HPP 291. 35 mmnd, (quota max. 296 mmnd)
  • Koman HPP 170. 86 mmnd, (quota max. 175.5 mmnd)
  • Vau i Dejës HPP 71. 88 mmnd (quota max. 76 mmnd)

Production in the three HPPs is:

  • Fierza HPP, 6,756 MWh (daily)
  • Koman HPP, 13, 297 MWh (daily)
  • Vau Dejës HPP, 4, 320 MWh (daily)

Total production meets all the demand for electricity consumption for the country.

For any change of data, the Electricity Corporation will keep transparently informed the public and the responsible authorities.