The current situation in the Drin river cascade is presented:
Natural arrivals in cascade are 690 m3 / s. The levels in the lakes of the Drini Cascade are:
* Fierzë HPP – 293.73 masl, (quota max. 296 masl)
* Koman HPP – 172.63 masl, (quota max. 175.5 masl)
* Vau i Dejës HPP –73.00 masl (max. Quota 76 masl)
Production in all three HPPs is:
* Fierzë HPP, 7,560 MWh (daily)
* Koman HPP, 7,100 MWh (daily)
* Vau Dejës HPP, 2,900 MWh (daily).
In any change of data, the Electroenergy Corporation will keep public opinion transparent informed and responsible authorities.