The current situation in the Drin river cascade is presented:

Natural arrivals in cascade are 320 m3 / s. The levels in the lakes of the Drini Cascade are:

* Fierzë HPP – 292.66 masl, (quota max. 296 masl)

* Koman HPP – 172.19 masl, (quota max. 175.5 masl)

* Vau i Dejës HPP –74.08 masl (max. Quota 76 masl)

Production in all three HPPs is:

* Fierzë HPP, 4,440 MWh (daily)

* Koman HPP, 6,000 MWh (daily)

* Vau Dejës HPP, 3,500 MWh (daily).

In any change of data, the Electroenergy Corporation will keep public opinion transparent informed and responsible authorities.