Situation in the Drin River cascade, dated 25.01.2021, at 12:00;
The levels in the lakes of the Drini Cascade are:

  • Hec Fierzë 289.21 mmnd, (quota max. 296 mmnd)
  • Hec Koman 170.12 mmnd, (quota max. 175.5 mmnd)
  • Hec Vau i Dejës 71.85 mmnd (max. Quota 76 mmnd)
    The output in all three HPPs is:
  • Fierza HPP, 6,000 MWh (daily)
  • Koman HPP, 12,700 MWh (daily)
  • Vau i Dejës HPP, 4,000 MWh (daily)
    Total production meets all the demand for electricity consumption for the country.Currently the natural flows in the cascade are 1560 m3 / s.
    The discharges from the ports are:
  • Fierza HPP – 299 m3 / s from production, 0 m3 / s discharges from the gates.
  • Koman HPP – 657 m3 / s from production, 0 m3 / s discharges from gates.
  • Vau i Dejës HPP – 430m3 / s from production, 300 m3 / s discharges from gates.
    KESH will continue to monitoring the situation by guaranteeing the complete safety of dams, electricity supply to domestic customers and avoiding the negative impact of discharges in the sub-Shkodra area.