The Electricity Corporation is monitoring the water level as well as the inflows into the Drin River cascade. The data of 13:00 are: Total natural flows in the cascade: 440m3 / s,

Emissions: 700 m3 / s from the port discharge at HPP Vau i Dejës

The level of the lakes at 13:00:

Fierza 289.47m

Koman 171.91m

Vau i Dejës 72.12m

Power generation at all three HPPs totally meets the requirements of OSHEE for electricity supply for domestic consumption.