The Electricity Corporation is monitoring the water level as well as the inflows into the Drin River cascade. The data of 13:00 are: Total natural flows in the cascade: 440m3 / s,
Emissions: 700 m3 / s from the port discharge at HPP Vau i Dejës
The level of the lakes at 13:00:
Fierza 289.47m
Koman 171.91m
Vau i Dejës 72.12m
Power generation at all three HPPs totally meets the requirements of OSHEE for electricity supply for domestic consumption.
![](http://www.kesh.al/wp-content/uploads/2021/01/139800636_2955776601375310_8315829231464213362_n.jpg)