The current situation in the Drin River cascade is:
Natural flows in the cascade are 790 m3 / s.
Discharges from production and discharge from gates are:
- Fierza HPP – 450 m3 / s from production, 400 m3 / s discharges from gates.
- Koman HPP – 678 m3 / s from production, 300 m3 / s discharges from gates.
- Vau Dejës HPP- 420 m3 / s from production, 900 m3 / s discharges from gates
- The levels in the lakes of the Drini Cascade are:
- Fierza HPP 291.68 mmnd, (quota max. 296 mmnd)
- Koman HPP169.99 mmnd, (quota max. 175.5 mmnd)
- Vau i Dejës HPP 72.33 mmnd (quota max. 76 mmnd)
Production in the three HPPs is:
- Fierza HPP, 8,061 MWh (daily)
- Koman HPP, 13,874 MWh (daily)
- Vau Dejës HPP, 4,528 MWh (daily)
Total production meets all the demand for electricity consumption for the country.
For any change of data, the Electricity Corporation will keep transparently informed the public and the responsible authorities.