Situation in the Drin River cascade, dated 03.02. 2021, at 12:00.

The current situation in the Drin River cascade is:


Natural flows in the cascade are 1240 m3 / s.

Discharges from production and discharge ports are:

  • Fierza HPP- 450 m3 / s from production, 300 m3 / s discharges from the gates.
  • Koman HPP- 684 m3 / s from production, 300 m3 / s discharges from gates.
  • Vau i Dejes HPP- 451 m3 / s from production, 300 m3 / s discharges from gates.

The levels in the lakes of the Drini Cascade are:

  • Hec Fierzë 292. 94 mmnd, (quota max. 296 mmnd)
  • Hec Koman 173. 11 mmnd, (quota max. 175.5 mmnd)
  • Hec Vau i Dejës 74.58 mmnd ( quota max. 76 mmnd)


The output in all three HPPs is:

  • Fierza HPP, 8.548 MWh (daily)
  • Koman HPP, 13, 825 MWh (daily)
  • Vau i Dejës HPP, 4,320 MWh (daily)
  • Total production meets all the demand for electricity consumption for the country.

 For any change of data, the Electricity Corporation will keep transparently informed the public and the responsible authorities.