The current situation in the Drin river cascade is presented:
Natural arrivals in cascade are 360 m3 / s.
The levels in the lakes of the Drini Cascade are:
* Fierzë HPP – 294.24 masl, (quota max. 296 masl)
* Koman HPP –173.79 masl, (quota max. 175.5 masl)
* Vau i Dejës HPP – 73.88 masl (max. Quota 76 masl).
Production in all three HPPs is:
* Fierzë HPP, 3,400 MWh (daily)
* Koman HPP, 5,700 MWh (daily)
* Vau Dejës HPP, 3,400 MWh (daily).
In any change of data, the Electroenergy Corporation will keep public opinion transparent informed and responsible authorities.