Kesh is continuing closely to monitor the situation of hydropower cascade and take all necessary measures for managing the flow and maintaining optimal levels, ensuring complete safety of dams and avoiding social environmental impact in residential areas.
The emissions from the Vau i Dejes HPP Gate have been reduced from 500 m3 / sec to 400 / m3sec
Currently the natural flows in the cascade are 1660 m3 /s.
The production and discharge ports are:
* Fierzë HPP- 390 m3 /s from production, 0 m3 / s discharges from the gates.
* Koman HPP- 678 m3 / s from production, 0 m3 / s discharges from gates.
* Vau Dejë HPP- 442 m3 / s from production, 400 m3/s discharges from the gates.
The levels in the lakes of the Drini Cascade are:
* Fierzë HPP 292. 14 mmnd, (quota max. 296 mmnd)
* Koman HPP 169. 62 mmnd, (quota max. 175.5 mmnd)
* Vau i Dejës HPP 73.03 mmnd (quota max. 76 mmnd)
Production in all three HPPs is:
* Fierzë HPP 7,233 MWh (daily)
* Koman HPP13, 733 MWh (daily)
* Vau i Dejës HPP 4,512 MWh (daily)
The total production meets all the demand for electricity consumption for the country.
For any change of data, the Electricity Corporation will keep transparently informed the public and the responsible authorities.