The Electricity Corporation is dynamically following the situation in the Drin River cascade.
Based on the data of 13.00; Production continues with all generating capacities, with a total of 26,500MWh (per day).
The level of the lakes is:
* Fierza 287.97 ma.s.l
* Koman 168.55 ma.s.l
* Vau i Dejës 71.12 ma.s.l
Discharges from the Vau i Dejes gate are 200 m3 / s