The Electricity Corporation is dynamically following the situation in the Drin River cascade.
Based on the data of 13.00;
Production continues with all generating capacities, with a total of 26,500MWh (per day).
The level of the lakes is:
- Fierza 288.13 mmnd
- Koman 169.36 mmnd
- Vau i Dejës 71.05 mmnd
Discharges from the Vau i Dejes gate are 500 m3 / s.