The Electricity Corporation is continuing to monitor water levels as well as inflows into the Drin River cascade. The situation remains in full control and the level of the lakes (08.00) is presented as follows:
Fierza 288.42 m
Koman 172.72 m
Vau i Dejës 75.30 m
Production continues to be at full capacity at HPP Koman and HPP Vau i Dejës.
