The current situation in the Drin river cascade, presented:

Natural cascade arrivals are 850 m3 / s. Downloads from production and download gates are:

* Hec Fierza-400 m3 / s from production, 300 m3 / s gate downloads.

* Hec Koman-684 m3 / s from production, 300 m3 / s downloads from gates.

* Hec Vau of Deja-439 m3 / s from production, 600 m3 / s downloads from the gates.

The levels in Drin’s Cascade lakes are:

* Hec Fierza 292.89 mmnd, (quota max. 296 mmnd)

* Hec Koman 173.38 mmnd, (max quota. 175.5 mmnd)

* Hec Vau i Dejes 74.07 mmnd (max quota. 76 mmnd)

Production in all three Hecs is:

* Hec Fierza, 8548 MWh (daily)

* Hec Koman, 13.825 MWh (daily)

* Hec Vau Dejes, 4.320 MWh (daily)

Total production meets all demand for electricity for the country. In any change of data, the Electroenergy Corporation will keep public opinion transparent and responsible authorities informed.